Threshold
Shared by Wendi Selig · Coldwell Banker
Buyer report · July 21, 2026

1380 Ridgeley Drive

Campbell, CA 95008
Total planning range
$7.5k–$19.1k

This one-story home, roughly 65–70 years old, is in generally solid condition for its age. The most consequential issue is the pool: none of the state-required child-drowning-prevention features are currently installed, which is the top priority below. A handful of other safety and code items are worth addressing early, and two older-but-functional systems — the furnace and tankless water heater — are worth budgeting for over the next several years rather than acting on immediately.

Tier · 7 items

Address now

Safety and code items to handle before or shortly after move-in.

Range
$2.9k–$6.5k
Severity 5/5Safety — do not wait
Pool / Safety

Pool has none of the required child-drowning-prevention features

Home inspector found zero of the 7 safety features required by CA Health & Safety Code §115922 (no fence/enclosure, no mesh fence, no safety cover, no exit alarms, no self-latching door hardware, no pool alarm).

$1.2k–$7.5k
Options to address · pick one
Minimum
Alarms & self-latching hardware on doors to the pool, plus a pool alarm
Meets the 2-feature minimum
$1.2k–$2.5k
Thorough
Removable mesh safety fence with self-closing gate
5' min height per CA code, more durable if young children will be around
$3.5k–$7.5k
Note · Pool perimeter wasn't in the documents so the mesh-fence quote needs an on-site measurement.
Home inspection report
$300–$600
$150–$600
$75–$150
$100–$200
$150–$1.5k
$950–$2.5k
Tier · 12 items

For consideration

Budget for year one — meaningful but not urgent.

Range
$3.9k–$10.4k
Severity 3/5Moderate
Drainage

Downspouts dumping water at the foundation

Downspouts aren't extended away from the building; runoff pools near the foundation.

$200–$600
Option to address
Add extensions/splash blocks or tie into a drain line
$200–$600
Home inspection report
$500–$8k
$150–$300
$20–$650
$250–$500
$200–$1.2k
$150–$300
$200–$400
$100–$250
$1.5k–$4k
$150–$350
$150–$650
Tier · 6 items

Lower-risk & FYI

Monitor, cosmetic, or context for planning.

Range
$725–$2.1k
Severity 2/5Low priority
Ventilation

Louvered foundation/crawlspace vents restrict airflow

Current vents limit ventilation compared to mesh-screen vents.

$200–$600
Option to address
Swap to mesh-screened vents
A handful of vents
$200–$600
Home inspection report
$300–$1k
$100–$200
$75–$150
$50–$200
No cost

On the horizon

Big-ticket systems that are fine today, but old enough to plan around.

1997, ~29 years old old
Furnace (forced-air gas)
Past typical 15–20 year service life remaining
$5k–$9k
Reactive replacement typically runs $5k–9k installed (full gas+AC replacement $12k–20k). BAAQMD's current rule would prohibit new gas furnace installs starting Jan 1 2029 — a post-2029 replacement would likely need to be a heat pump system, generally $8k–16k installed.
1996, ~30 years old old
Tankless water heater
Unusually old for a tankless unit, delivering hot water as designed remaining
$3.4k–$9.2k
Comparable gas tankless replacement typically runs $3.4k–9.2k installed in the Bay Area.

Additional scope to include in your bid packet

Add anything else you'd like contractors to bid on — improvements, upgrades, or work that wasn't flagged in the disclosures. Attach photos or notes to sharpen the bid.

Common additions

Ready to get real numbers?

Send your selected scope to three vetted contractors. You'll get comparable bids in a standardized packet, plus a pre-bid consult with your Project Manager.